Solar panel removal and reinstallation on a Burleson, TX home

Burleson Solar Panel Removal & Reinstall — Coordinated With Your Roofer

Removal, secure storage, and reinstallation for Burleson homeowners replacing roofs or upgrading systems.

Burleson, TX

What Burleson homeowners face when reroofing with solar installed

ZIP 76028 and the rest of Burleson sit inside the Johnson County insurance map where roof claims have averaged 1.5 approved replacements per year. Climate-zone trends in subtropical-DFW mean roof damage events keep accelerating, and removal/reinstall demand follows. If your Burleson roof is over 18 years old and panels are bolted to it, you're already past the optimal point for proactive removal. If you're adding a second story or an attached ADU on top of an existing Burleson roof with solar, the panels in the impacted area have to come off before structural work begins. We handle the Oncor disconnect and reconnect notifications directly — your net-meter agreement stays continuous through the project. Our team coordinates the Burleson schedule with your roofer, handles secure storage at our DeSoto facility, and reinstalls within 24-48 hours of the new roof completing.

Solar in Burleson: common questions

Why can't my Burleson roofer remove my panels themselves?

Reputable Burleson roofers refuse to touch solar panels. Roofing contractors aren't licensed to disconnect electrical equipment in Texas, and panel manufacturer warranties (SunPower, Q Cells, REC, Silfab and others) explicitly void coverage if non-certified personnel handle them. Our team coordinates with your roofer's schedule — removal day-before tear-off, reinstall 24-48 hours after the last shingle is down. End-to-end project length in Burleson is usually 5-7 working days.

Is removal a good time to add battery storage in Burleson?

Yes — removal is the cheapest possible window for any panel-side upgrade in Burleson. Microinverter swaps (Enphase IQ7 → IQ8, or string-inverter retrofits to Enphase) are easiest during removal — the labor that's most expensive is already covered. Re-pulling wires through the racking while the panels are off adds zero incremental cost.

How many days will my solar be down during a Burleson reroof?

We complete most Burleson removals in 4-6 hours of on-site work. Reinstallation: 6-8 hours including testing and Oncor reconnection paperwork. Schedule on our side: removal one day before tear-off, reinstall within 24-48 hours of last shingle. Most Burleson reroof projects run 3-5 working days for the roofer; we book panels-off the day before and panels-back-on 24-48 hours after the last shingle is laid. Disconnect and reconnect notices to Oncor are filed by our team; the interconnection agreement carries through the project.

Solar in Burleson

What Burleson homeowners should know about their solar

Real, local context for keeping a solar system healthy in Burleson, Johnson County.

Your utility

Oncor is the wires utility for Johnson County. Texas is deregulated, so there is no statewide net metering — your solar export credit depends on your retail electricity plan, not the utility.

Expected production

At Burleson’s ~4.9 peak sun hours, a typical 7 kW system produces roughly 10,000 kWh/year. If yours is running well below that, it’s worth a service check.

Local climate

On the southern edge of North Texas “Hail Alley,” the Johnson/Tarrant area sees frequent spring hail and severe thunderstorms.

Permits & local notes

Burleson permits solar through Building Permits & Inspections (817-426-9632); some parcels route between city and county. Burleson is the largest city in Johnson County (though Cleburne is the seat) at a high ~725 ft elevation.

Trusted Partners

Situations That Require Solar Panel Removal

Solar panels need to be removed whenever roofing or structural work requires full access to the roof surface. Common scenarios include:

Trying to work around solar panels often increases costs and delays the project.

Full roof replacement
Hail or storm damage repairs
Insurance-approved roofing claims
Major exterior or structural renovations
Situations That Require Solar Panel Removal in Burleson, TX
Get Free Quote

Why Solar Removal Is Different From Roofing Work

Solar removal is a solar-specific process, not a roofing task. Panels, racking, and electrical connections must be handled correctly to avoid long-term issues.

Improper removal can cause:

Roof leaks after reinstallation
Damaged mounting points or flashing
Electrical or inverter issues
Reduced energy production
Voided manufacturer warranties
Get Free Quote

Our Solar Removal & Reinstallation Process

1

Phase 1: System Shutdown & Documentation

  • Safe shutdown of the solar system
  • Documentation of panel layout and wiring
  • Pre-removal inspection
2

Phase 2: Panel Removal & Roofer Coordination

  • Careful removal of panels and racking
  • Protection of roof penetrations
  • Coordination with your roofing contractor
3

Phase 3: Reinstallation & System Testing

  • Reinstallation using the original layout
  • Electrical reconnection
  • Full system performance testing

Solar Removal Services in Burleson, TX

Homes in Burleson often require solar panel removal due to hail storms, aging roofs, or insurance-driven repairs. We work directly with roofers to ensure the solar portion of the project stays aligned with construction timelines and avoids delays.

Solar Removal Services in Burleson, TX in Burleson, TX
Get Free Quote

Why Burleson Homeowners Choose The Light Group USA

Dedicated solar removal & reinstallation specialists
Fully insured and trained technicians
Experience with residential solar systems in Burleson
Focus on roof protection and long-term performance
Clear, responsive communication
Get Free Quote
Where We Work

Service Areas

20States Active
10K+Homes Served
60+5-Star Reviews
$0Upfront Cost

Nearby Areas We Also Serve

In addition to Burleson, we provide solar panel removal and reinstallation services in:

Reviews

What homeowners are saying

“Boy oh boy are we satisfied with the installation of our solar panels! Extremely efficient, approachable, and professional — and highly competitive pricing.”

Jaelyn Cooper·Solar Installation

“Professional, punctual, and very knowledgeable. They quickly identified the issue, explained everything clearly, and got it done.”

Shawndal Johnson·Solar Repair

“They removed the panels safely, coordinated smoothly with the roofers, and reinstalled everything quickly.”

Eduardo Rivera·Panel Removal & Reinstall

“Hands down the best choice. Extremely professional, efficient, and detail-oriented — and the most cost-effective without sacrificing quality.”

R. L.·Solar Installation

“We really enjoy our solar and battery back-up. The most cost-effective option I’ve seen compared to other companies.”

Alexis De Hoyos·Solar + Battery

“Giovanni was on time and very organized, and he actually takes pride in his work and presentation. Something you don’t see a lot.”

Mike Hamro·Panel Upgrade

“They came out, troubleshooted my system, found the problem, installed the parts, and got my system up and running.”

Barry Shuping·System Repair

Frequently Asked Questions

Yes. In most cases, panels must be removed to properly replace shingles, underlayment, or flashing.

Most roofers are not licensed or insured to handle solar equipment. Using a certified solar provider helps avoid damage and warranty issues.

Not when handled by trained professionals. We follow strict procedures to protect panels, wiring, and mounting hardware.

Removal typically takes one day. Reinstallation occurs after roofing work is complete and usually takes one additional day.

Yes—when removal and reinstallation are performed correctly by certified professionals.

Get your solar system back to full performance

Don't let hidden issues cost you money. Let's fix it fast.

By submitting or calling, you consent to receive calls and SMS from The Light Group USA at the number provided. Reply STOP to opt out. See our Privacy Policy.

From the Blog

Continue learning